On May 27, 2025, the Texas Legislature passed SB-6, which introduces significant changes to the planning, interconnection, operation, and cost allocation of certain large electrical loads within the Electric Reliability Council of Texas (“ERCOT”), including data centers. SB-6 primarily aims to ensure that large-load customers contribute fairly to the recovery of costs incurred by electric utilities when interconnecting and serving these loads….
By: Mayer Brown
By: Mayer Brown